MIMAKI SINGAPORE PTE. LTD.

Floor plan and environmental requirements for installation.

  • Leave adequate clearance on all sides of the machine for printing.

1,000mm or more is required in front of and behind the machine.
500mm or more is required both the left and right sides of the machine.
* In addition to the above area, the installation space for RIP computer is also required.



Return to Content

PAGETOP